Storm Jibs


Our popular line of storm jibs are built to withstand the worst of weather conditions. Whether cruising or racing offshore, no boat should be without this essential piece of safety equipment.

Each of our storm sails include the following features:

  • Your Choice of Hanks or #6 Luff Tape
  • Orange Visibility Patches at Head, Tack & Clew
  • Triple-Step Zig-Zag Stitching
  • Heavy Duty Bonded UV Thread
  • Half-Moon Protective Patches (Hank-On Models)
  • Leech Line with Reinforced Cleat
  • Heavy Duty Rutgerson Super Rings
  • Sail Bag
  • Three Year Warranty

Storm jib sizing below is applicable to medium displacement boats. Owners of heavy displacement yachts should consider moving up one size. Additionally, you may wish to do the same if sailing in areas with heavier winds such as Buzzards Bay, San Francisco and Hawaii.


Storm Jib: Yachts 20' to 28'

8.0 oz. Challenge Dacron

Choice of #6 Luff Tape (Furling) or Piston Hanks

  • Luff: 13'
  • Leech: 9'.8"
  • Foot: 6'.7"
  • Area: 32.3 s.f.

 Just $73.75 per month with SailPay!

 

$265.00

  • Current Production Time: 3 to 4 Weeks Maximum
  • Varies By Location

Storm Jib: Yachts 25' to 32'

8.0 oz. Challenge Dacron

Choice of #6 Luff Tape (Furling) or Piston Hanks

  • Luff: 15'.6"
  • Leech: 12'.1"
  • Foot: 7'.9"
  • Area: 48.4 s.f.

 Just $83.75 per month with SailPay!

 

$335.00

  • Current Production Time: 3 to 4 Weeks Maximum
  • Varies By Location

Storm Jib: Yachts 30' to 36'

9.0 oz. Challenge Dacron

Choice of #6 Luff Tape (Furling) or Piston Hanks

  • Luff: 17'.7"
  • Leech: 13'.8"
  • Foot: 8'.9"
  • Area: 61.4 s.f.

 Just $108.75 per month with SailPay!

 

$425.00

  • Current Production Time: 3 to 4 Weeks Maximum
  • Varies By Location

Storm Jib: Yachts 35' to 41'

9.0 oz. Challenge Dacron

Choice of #6 Luff Tape (Furling) or Piston Hanks

  • Luff: 20'
  • Leech: 15'.8"
  • Foot: 10'
  • Area: 80.7 s.f.

 Just $136.25 per month with SailPay!

 

$545.00

  • Current Production Time: 3 to 4 Weeks Maximum
  • Varies By Location

Storm Jib: Yachts 38' to 50'

9.0 oz. Challenge Dacron

Choice of #6 Luff Tape (Furling) or Piston Hanks

  • Luff: 22'.6"
  • Leech: 18'
  • Foot: 11'.3"
  • Area: 102.2 s.f.

 Just $156.25 per month with SailPay!

 

$595.00

  • Current Production Time: 3 to 4 Weeks Maximum
  • Varies By Location

Storm Jib: Yachts Over 50'

9.0 oz. Challenge Dacron

Choice of #6 Luff Tape (Furling) or Piston Hanks

  • Luff: 25'.6"
  • Leech: 20'
  • Foot: 12'.8"
  • Area: 129.2 s.f.

 Just $196.25 per month with SailPay!

 

$695.00

  • Current Production Time: 3 to 4 Weeks Maximum
  • Varies By Location

The ATN Gale Sail

The ATN Gale Sail is the safest and easiest way to hoist a storm jib in heavy conditions.

 

Simply furl the genoa sheets down to the deck and hank the Gale Sail over the furled headsail, attach its sheets and hoist it with a spare halyard. The reinforced Dacron pouch easily slides up and down over the furled sail and prevents any accidental unfurling of the genoa.

 

The Gale Sail eliminates the need to unfurl, lower and pack the genoa to hoist the storm jib.

 

Gale Sail Models:

  • Yachts Up to 27' (Area: 30 s.f.)
  • Yachts 28' to 35' (Area: 60 s.f.)
  • Yachts 36' to 43' (Area: 100 s.f.)
  • Yachts 44' to 52' (Area: 150 s.f.)


ATN Gale Sail

In Stock & Ready To Ship!

$475.00

  • Ships within 1-3 days